From the picture, you can see that the breakwater has been completed (Carillion Alawi are to thank for that). The rather alarming lack of Command Centre (the Press area), Marina Hotel and Marina Residences building, coupled with the fact that it is August 2009, does suggest that the intended completion date of June 2010 might be hard to achieve. But not impossible. Maybe.

This other smaller picture is an elevation of what the site is intended to look like. I think either the Marina Hotel or Marina Residences building has commenced, because in the first picture you can see a little suggestion of work in the bottom left hand corner.
Well let's hope that L&T wake up and get their finger out and start to actually get this project built. I remain positive that something will be ready, just perhaps not what was originally envisaged.
The other point of note is that the games are scheduled to be held in December 2010 (source) and I'm sure that with those extra months, a lot of finishing touches will be completed.
Speaking of sporting events, has everyone got their F1 tickets for the Abu Dhabu grand prix on November 1st?